Cameron County power projects

Cameron County, Texas has 26 active power projects totalling 5,766 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 2,942 MW (51%). The largest single project is Aegle Power (1,536 MW natural gas). 5 projects have signed an interconnection agreement or reached a later stage. 2 projects in the county are listed as withdrawn or cancelled.

Active projects
26
5.8 GW capacity
IA signed or later
5
19% of active projects
Withdrawn or cancelled
2
listed by ERCOT
Changes tracked
2
since Sep 2026

Changes in Cameron County

Withdrawn
Unconfirmed
10/01/2026
Mesquite BESS2 · BESS · Cameron County
Missing from the latest report, not yet marked withdrawn by ERCOT.
−10 MW
Withdrawn
09/23/2026
Alexandrite Storage · BESS · Cameron County
Listed as cancelled by ERCOT.
−203 MW

All projects

ProjectFuelMWSubstationStageCOD
Aegle PowerGas1,536(#79501) Kingfisher 345 kVFIS Requested07/30/2027
Pachanga WindWind300tap 345kV 5966 Palmito - 80137 Stewart RdFIS Requested04/08/2030
Eval StorageBESS25280229 Cavazos 138kVIA Signed04/30/2029
Puerto Del Sol 1Solar214Tap 345kV 79500 Palmito - 79501 King Fisher Ckt 1FIS Requested12/31/2026
Puerto Del Sol 2Solar214Tap 345kV 79500 Palmito - 79501 King Fisher Ckt 1FIS Requested12/31/2027
Ouroboros Grid BESS 4BESS20179500 Palmito 345kVScreening06/01/2029
Ouroboros Grid BESS 5BESS20179500 Palmito 345kVScreening06/01/2029
Ouroboros Grid BESS 6BESS20179500 Palmito 345kVScreening06/01/2029
Bobcat Cameron BESSBESS2015764 East Rio Hondo Substation 138kVFIS Requested12/31/2027
Rio Hondo BESSBESS201Tap 138kV #80309 Las Pulgas - #8319 Rio HondoFIS Requested06/30/2028
Ouroboros Grid BESS 1BESS201POIB: #88337 Chalybe 345 kVScreening06/01/2028
Ouroboros Grid BESS 2BESS20188337 Chalybe 345 kVScreening06/01/2028
Resaca Oasis StorageBESS201# 79601 Stillman Substation 138 kVIA Signed09/20/2028
Ouroboros Grid BESS 3BESS20188337 Chalybe 345 kVScreening06/01/2028
Accalia Point SolarSolar190Tap 345kV 8383 North Edingburg – 79501 KingfisherFIS Requested05/31/2029
Harryoung SolarSolar190Tap 8319 Rio Hondo - SOUTH SANTA ROSA: 8359, 138kVFIS Requested05/15/2028
HarryoungBESSBESS1908319 Rio Hondo sub 138kVFIS Requested05/15/2028
Arroyo StorageBESS184Tap 345kV 8318 Rio Hondo - 8317 La Palma (New Gulch Substation )Sync Approved10/23/2026
Amberjack2 BESSBESS18079501 KINGFISHER 345KVFIS Requested04/03/2028
Megacharge BESSBESS1108320 WEST HARLINGEN 69kVFIS Requested07/01/2028
Solar Star Frontier BESSBESS1018656 Luna 138kVFIS Requested02/27/2029
Arroyo SolarSolar100345 KV Tap #8318 Rio Hondo - #8317 La PalmaIA Signed02/22/2028
Harper Energy StorageBESS82Tap 138kV 8314 La Palma - 80229 Villa CavazosFIS Requested09/15/2028
Rio Grand Valley Element Fuels PowerOther80Tap 138kV 59450 Waterport Substation - 5789 Southmost SubFIS Requested12/05/2028
Burro Loco Energy StorageBESS258626 Resaca 69kVFIS Requested09/15/2028
Harlingen #1 BESS 1BESS10Harlingen #1Sync Approved08/21/2026
Alexandrite StorageBESS2038359 Santa Rosa (S_SNROSA4A) 138kVWithdrawn12/10/2026
Mesquite BESS2BESS10New DESR on the coordinates above tie at 12.47kV to:Withdrawn08/31/2026

For residents and landowners

What power projects are planned in Cameron County?
ERCOT's October 2026 report lists 26 active projects in Cameron County totalling 5,766 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.