28INR0398 · BESS · Cameron County

Ouroboros Grid BESS 2

Ouroboros Grid BESS 2 is a 201 MW battery storage project in Cameron County, Texas, connecting at 88337 Chalybe 345 kV. ERCOT's October 2026 report shows it at the Screening stage with a projected commercial operation date of 06/01/2028.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
28INR0398
Capacity
201 MW
Fuel
BESS (BA)
Interconnecting entity
Ouroboros Grid BESS Unit 2
Projected COD
06/01/2028
Entered queue
07/29/2025
ERCOT zone
COASTAL
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 07/29/2025
    Entered the queue with 201 MW, projected COD 06/01/2028

Other projects at this substation

Ouroboros Grid BESS 3BESS201 MWScreening