Lamar County power projects

Lamar County, Texas has 24 active power projects totalling 6,054 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 3,029 MW (50%). The largest single project is Southeast Oklahoma Pumped Storage (1,232 MW other). 15 projects have signed an interconnection agreement or reached a later stage. 3 projects in the county are listed as withdrawn or cancelled.

Active projects
24
6.1 GW capacity
IA signed or later
15
62% of active projects
Withdrawn or cancelled
3
listed by ERCOT
Changes tracked
6
since Sep 2026

Changes in Lamar County

COD change
10/01/2026
Echols Grove Solar · Solar · Lamar County
Projected COD moved 01/28/2028 → 06/30/2027. Moved earlier.
-7 mo
Stage change
09/17/2026
Rowdy Creek Solar · Solar · Lamar County
Moved from FIS Requested to FIS Approved.
FIS Approved
Stage change
09/16/2026
Star Dairy Storage · BESS · Lamar County
Moved from FIS Requested to FIS Approved.
FIS Approved
Stage change
09/16/2026
Star Dairy Solar · Solar · Lamar County
Moved from FIS Requested to FIS Approved.
FIS Approved
Stage change
09/03/2026
Roxton Solar · Solar · Lamar County
Moved from FIS Approved to IA Signed.
IA Signed
Stage change
09/03/2026
Roxton Storage · BESS · Lamar County
Moved from FIS Approved to IA Signed.
IA Signed

All projects

ProjectFuelMWSubstationStageCOD
Southeast Oklahoma Pumped StorageOther1,2321692 Paris Switch 345kVFIS Requested01/01/2030
North Royal Thermal (TEF- Due Diligence)Gas479Tap 345kV 1695 MOSES_5 - 11699 WOODARD_5FIS Requested08/01/2030
Baker Branch SolarSolar469tap 345kV 1692 Paris - 1690 ValleySync Approved09/30/2026
Bug Tussle Wind ProjectWind397Tap 1729 Valley South and 1692 ParisIA Signed09/18/2028
Rowdy Creek SolarSolar352Woodfin Switch (#1465) 345kVIA Signed12/29/2027
Delilah Solar 2Solar318345 kV TTRSW 11688Sync Approved12/31/2026
Delilah Solar 1Solar300tap both 345kV 1685 FarmersVl - 1695 Moses cktsSync Approved12/31/2026
Baker Branch BESSBESS287Pacific Switch (PACSW) 345 kV Bus 11683FIS Requested12/31/2029
Samson Solar 1Solar250tap both 345kV 1685 FarmersVl - 1695 Moses cktsSync Approved12/31/2026
Samson Solar 3Solar250tap both 345kV 1685 FarmersVl - 1695 Moses cktsSync Approved12/31/2026
Star Dairy StorageBESS205Tap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5IA Signed07/12/2027
Arc Energy StorageBESS204Tap 138kV 1693 Paris Switch - 11806 ENLOE T8FIS Approved06/30/2028
Samson Solar 2Solar203345 kV TTRSW 11688Sync Approved12/31/2026
Echols Grove SolarSolar202Tap 138kV Hawk Hollow Switch (#11768) and Lamar Blossom Switch (#11770)IA Signed06/30/2027
Lan Solar SLFSolar182Tap 345kV 1729 Valley South – 1692 Paris SwitchFIS Requested08/26/2028
MRG GOODY SOLARSolar171Tap 138 kV Toco Switch (#1700) – Paris Switch (#1693)Sync Approved08/28/2026
Roxton SolarSolar117Tap 138 KV Bois Pump (1835) - Brookston (1833)IA Signed07/21/2028
Star Dairy SolarSolar116Tap 345kV 1692 PARIS_SW1_5 -- 11699 WOODARD_5IA Signed07/12/2027
Roxton StorageBESS102Tap 138 KV Bois Pump (1835) - Brookston (1833)IA Signed07/21/2028
Mud Cat Solar SLFSolar100Tap 138KV 11768 Hawk Hollow – 1768 DeportFIS Requested09/18/2028
Lamar Unit 1 RepowerGas661692 Paris Switch Station 345kVFIS Requested12/18/2027
MRG Goody StorageBESS52Tap 138 kV Toco Switch (#1700) – Paris Switch (#1693)Sync Approved08/28/2026
Lan Battery SLFBESS0Tap 345kV 1729 Valley South – 1692 Paris SwitchFIS Requested08/26/2028
Mud Cat Storage SLFBESS011768 Hawk Hollow – 1768 Deport 138kVFIS Requested09/18/2028
Beaujolais BESSBESS307Not listedWithdrawnn/a
Hoskins SolarSolar204Not listedWithdrawnn/a
Rosscommon SolarSolar91Not listedWithdrawnn/a

For residents and landowners

What power projects are planned in Lamar County?
ERCOT's October 2026 report lists 24 active projects in Lamar County totalling 6,054 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.