Ward County power projects
Ward County, Texas has 13 active power projects totalling 3,429 MW in ERCOT's interconnection queue as of the October 2026 report. Natural gas is the largest share at 2,258 MW (66%). The largest single project is BasRanch (TEF - Due Diligence) (1,350 MW natural gas). 4 projects have signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.
Active projects
13
3.4 GW capacity
IA signed or later
4
31% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
4
since Sep 2026
Changes in Ward County
Stage change
09/18/2026
Sync Approved
Stage change
09/16/2026
Vast Sands Power I (TEF -Due Diligence) · Gas · Ward County
Moved from FIS Requested to FIS Approved.
FIS Approved
Stage change
09/16/2026
Vast Sands Power II (TEF-Due Diligence) · Gas · Ward County
Moved from FIS Requested to FIS Approved.
FIS Approved
Stage change
09/02/2026
Energization Approved
All projects
For residents and landowners
- What power projects are planned in Ward County?
- ERCOT's October 2026 report lists 13 active projects in Ward County totalling 3,429 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.