Mclennan County power projects

Mclennan County, Texas has 18 active power projects totalling 3,383 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 1,679 MW (50%). The largest single project is Axtell BESS (307 MW battery storage). 9 projects have signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.

Active projects
18
3.4 GW capacity
IA signed or later
9
50% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
2
since Sep 2026

Changes in Mclennan County

Stage change
09/02/2026
Albatross BESS 2 · BESS · Mclennan County
Moved from FIS Approved to IA Signed.
IA Signed
Stage change
09/02/2026
Albatross BESS · BESS · Mclennan County
Moved from FIS Approved to IA Signed.
IA Signed

All projects

ProjectFuelMWSubstationStageCOD
Axtell BESSBESS307345 kV Tiger Creek Switch (#3379)FIS Requested04/16/2029
Jaguar SolarSolar301Tap 345kV 13405 Tradinghouse SES - 68090 Sam SwitchIA Signed12/11/2027
Brazos Energy Center 1BESS301Tap 345 3791 POSSUMTROT_5 - 3403 LAKE_HALL_5FIS Requested09/18/2029
Brazos Energy Center 2BESS301Tap 345 3791 POSSUMTROT_5 - 3403 LAKE_HALL_5FIS Requested09/18/2029
Prairie Hill WindWind297tap 345kV 3405 Tradinghouse - 3402 Lake CreekSync Approved09/30/2027
Prairie Phoenix WindWind2973403 Lake Hall 345kVFIS Requested08/24/2028
PowerVault BESSBESS255Tap 345kV 3406 Elm Mott - 3405 Tradinghouse SesFIS Requested07/01/2028
Cibeles SolarSolar2523379 Tiger Creek Switch (TIGERCREEK_5) 345 kV SubstationIA Signed08/15/2028
Finch StorageBESS201165 WINDSORSW 138kVFIS Requested09/30/2028
Infrakey Waco Data Park Gas 1Gas180Tap 345kV 246 BOSQUESW5 – 3406 ELM_MOTT__5FIS Requested06/01/2030
Tokio SolarSolar170Tap 138kV 3592 Waco Atco - 170 Cotton BeltIA Signed08/25/2027
Albatross BESS 2BESS160Tap 138kV 165 Windsor Switch - 161 McGregorIA Signed12/30/2028
Pepper Solar FarmSolar121Tap 345kV 3405 THOUSE__5 - 3406 ELM_MOTT_5IA Signed09/20/2027
Neutron StorageBESS104Tap 345kV 13405 Trading House - 68090 Sam SwitchIA Signed04/29/2028
Albatross BESSBESS50From Bus #165 Windsor Switch To Bus #161 McGregorIA Signed12/30/2028
Graphic Packaging GasGas43Tap 138kV 3446 Peppervine Switch - 3544 Castleman SubstationIA Signed02/15/2027
Braswell SolarSolar43Tap 69kV 147 Lorena - 3580 Eddy Substation (Will be converted to 138kV line before 3/14/25 per TSP)FIS Requested03/15/2028
Infrakey Waco Data Park Gas 2Gas0252 BOSQUESW8 138kVFIS Requested06/01/2030

For residents and landowners

What power projects are planned in Mclennan County?
ERCOT's October 2026 report lists 18 active projects in Mclennan County totalling 3,383 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.