Counties / Texas
Mills County power projects
Mills County, Texas has 7 active power projects totalling 1,410 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 776 MW (55%). The largest single project is Priddy Wind (302 MW wind). 3 projects have signed an interconnection agreement or reached a later stage. 2 projects in the county are listed as withdrawn or cancelled.
Active projects
7
1.4 GW capacity
IA signed or later
3
43% of active projects
Withdrawn or cancelled
2
listed by ERCOT
Changes tracked
2
since Sep 2026
Changes in Mills County
MW change
10/01/2026
105 → 209 MW
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Priddy Wind | Wind | 302 | tap 345kV 1444 Brown – 3422 Killeen | Sync Approved | 12/31/2026 |
| Starlight Storage | BESS | 209 | Tap 138kV 7070 Goldthwaite – 77074 San Saba Switch | IA Signed | 05/09/2030 |
| Clapton Storage | BESS | 209 | Tap 345 kV 3424 Buckhorn Switch - 1444 Brown Switch | FIS Requested | 08/09/2028 |
| Clapton Solar | Solar | 201 | Tap 345 kV 3424 Buckhorn Switch - 1444 Brown Switch | FIS Requested | 08/09/2028 |
| Cash Mills Storage Center | BESS | 201 | Tap Line between Evant (bus#7068) and Goldthwaite (Bus# 7070) | FIS Requested | 06/01/2029 |
| Moss Rock Storage | BESS | 157 | #7070 Goldthwaite 138kV | Screening | 12/31/2029 |
| Starlight Solar | Solar | 131 | tap the 138 kV Goldthwaite (#7070) – San Saba Switch (#77074) | IA Signed | 05/09/2030 |
| Castle Corral BESS | BESS | 201 | Not listed | Withdrawn | n/a |
| Starlight Storage 2 | BESS | 104 | Not listed | Withdrawn | n/a |
For residents and landowners
- What power projects are planned in Mills County?
- ERCOT's October 2026 report lists 7 active projects in Mills County totalling 1,410 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.