Counties / Texas
Kenedy County power projects
Kenedy County, Texas has 4 active power projects totalling 1,311 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 609 MW (46%). The largest single project is Tall Saddle Wind (523 MW wind). 0 projects have signed an interconnection agreement or reached a later stage. 1 project in the county is listed as withdrawn or cancelled.
Active projects
4
1.3 GW capacity
IA signed or later
0
0% of active projects
Withdrawn or cancelled
1
listed by ERCOT
Changes tracked
2
since Sep 2026
Changes in Kenedy County
Stage change
09/29/2026
FIS Approved
Stage change
09/29/2026
FIS Approved
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Tall Saddle Wind | Wind | 523 | 80076 AJO SUBSTATION 345kV | FIS Requested | 10/15/2029 |
| Green Ocelot Solar | Solar | 357 | Tap 345kV 80076 Ajo - 8601 Cebolla | FIS Approved | 11/17/2028 |
| Tall Saddle Solar | Solar | 252 | 80076 AJO SUBSTATION 345kV | FIS Requested | 10/15/2029 |
| Green Ocelot Storage | BESS | 178 | Tap 345kV 80076 Ajo 80076 - 8601 Cebolla | FIS Approved | 11/17/2028 |
| Gulf Wind 2 | Wind | 226 | Not listed | Withdrawn | n/a |
For residents and landowners
- What power projects are planned in Kenedy County?
- ERCOT's October 2026 report lists 4 active projects in Kenedy County totalling 1,311 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.