LoneStarGrid
ERCOT GIS report of 10/01/2026 2 monthly reports compared Next update after ERCOT's next monthly report
Counties / Texas

Guadalupe County power projects

Guadalupe County, Texas has 17 active power projects totalling 4,064 MW in ERCOT's interconnection queue as of the October 2026 report. Natural gas is the largest share at 2,460 MW (61%). The largest single project is Calpine Guadalupe Peakers (450 MW natural gas). 6 projects have signed an interconnection agreement or reached a later stage. 3 projects in the county are listed as withdrawn or cancelled.

Active projects
17
4.1 GW capacity
IA signed or later
6
35% of active projects
Withdrawn or cancelled
3
listed by ERCOT
Changes tracked
0
since Sep 2026

Changes in Guadalupe County

No changes in the reports compared so far.

All projects

ProjectFuelMWSubstationStageCOD
Calpine Guadalupe PeakersGas4507044 Marion 345kVFIS Requested05/30/2030
Alpha Power Phase 1Gas400345kV 7042 Zorn SubstationFIS Requested12/31/2028
Alpha Power Phase 2Gas400345kV 7042 Zorn SubstationFIS Requested12/31/2029
Alpha Power Phase 3Gas400345kV 7042 Zorn SubstationFIS Requested12/31/2030
Alpha Power Phase 4Gas400345kV 7042 Zorn SubstationFIS Requested12/31/2031
Alpha Power Phase 5Gas400345kV 7042 Zorn SubstationFIS Requested12/31/2032
Enfinity Juniper StorageBESS261Hickory Forest (7225)FIS Requested12/18/2029
Rockridge SolarSolar2117225 Hickory Forest 138kVIA Signed06/27/2028
Guadalupe Battery Storage ProjectBESS2107044 Marion 345kVFIS Requested05/30/2030
Nockenut Springs Solar 2Solar203tap 345kV 5133 Elm Creek - 5915 STP ckt 1IA Signed06/05/2029
Nockenut Springs Solar 1Solar203tap 345kV 5133 Elm Creek - 5915 STP ckt 1IA Signed06/05/2029
Ruedrich BESSBESS201LINE TAP OF CIBOLO (7608) AND McQUEENEY (7606)FIS Requested11/09/2028
Aster SolarSolar1607042 Zorn 345kVFIS Requested06/01/2029
Roble BESSBESS1547180 L_ZORN__8_1Y 138kVFIS Requested12/01/2028
Rio Nogales CT1 Rotor ReplacementGas3Rio Nogales SubstationSync Approved08/07/2026
CPS Rio Nogales CT301 Rotor ReplacementGas35362 RIONOG 345kVSync Approved08/07/2026
CPS Rio Nogales CT201 Rotor ReplacementGas35362 RIONOG 345kVSync Approved08/07/2026
Utica SolarSolar204Not listedWithdrawnn/a
Utica BESSBESS204Not listedWithdrawnn/a
Sparkl BESSBESS20Not listedWithdrawnn/a

For residents and landowners

What power projects are planned in Guadalupe County?
ERCOT's October 2026 report lists 17 active projects in Guadalupe County totalling 4,064 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.