Bosque County power projects
Bosque County, Texas has 3 active power projects totalling 383 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 208 MW (54%). The largest single project is Woodland Energy Storage (208 MW battery storage). 0 projects have signed an interconnection agreement or reached a later stage. 5 projects in the county are listed as withdrawn or cancelled.
Active projects
3
0.4 GW capacity
IA signed or later
0
0% of active projects
Withdrawn or cancelled
5
listed by ERCOT
Changes tracked
0
since Sep 2026
Changes in Bosque County
No changes in the reports compared so far.
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Woodland Energy Storage | BESS | 208 | 68040 Kopperl Substation 345kV | FIS Requested | 10/01/2030 |
| Solheim Solar | Solar | 109 | Meridian (Bus# 315) - Glen Rose (Bus #319) 69 kV | FIS Approved | 11/01/2027 |
| Symank Solar | Solar | 66 | Tap 69 kV 37470 TNOLSEN - 37520 TNSYCAMORE | FIS Requested | 12/15/2027 |
| Sultan Solar | Solar | 206 | Not listed | Withdrawn | n/a |
| Sultan BESS | BESS | 204 | Not listed | Withdrawn | n/a |
| Rueter Solar | Solar | 200 | Not listed | Withdrawn | n/a |
| Angus Storage | BESS | 63 | Not listed | Withdrawn | n/a |
| Hickerson BESS | BESS | 0 | Not listed | Withdrawn | n/a |
For residents and landowners
- What power projects are planned in Bosque County?
- ERCOT's October 2026 report lists 3 active projects in Bosque County totalling 383 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.