Substation / point of interconnection ยท Brazoria County
(CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640)
2 active projects totalling 410 MW are queued to connect at (CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640) in Brazoria County, Texas, according to ERCOT's October 2026 report.
Active capacity
410 MW
queued at this substation
Active projects
2
2 projects ever listed
Withdrawn share EST
0%
of projects listed here
Voltage
138 kV
read from the name
Projects at this substation
| INR | Project | Fuel | MW | Stage | COD | Delays |
|---|---|---|---|---|---|---|
| 28INR0448 | Gulf Prairie BESS | BESS | 208 | FIS Requested | 12/01/2028 | 0 |
| 27INR0449 | Gulf Prairie Solar | Solar | 202 | FIS Requested | 12/01/2028 | 0 |