28INR0448 · BESS · Brazoria County
Gulf Prairie BESS
Gulf Prairie BESS is a 208 MW battery storage project in Brazoria County, Texas, connecting at (CEHESub) looped either 1) on 138 kV circuit 82 between RIWOOD (#43150) and Angleton (#42110), or 2) on 345 kV circuit 18 between DOW (#42500) and Huizache (#46640). ERCOT's October 2026 report shows it at the FIS Requested stage with a projected commercial operation date of 12/01/2028.
ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved
Key facts
- INR
- 28INR0448
- Capacity
- 208 MW
- Fuel
- BESS (BA)
- County
- Brazoria County
- Interconnecting entity
- Gulf Prairie Energy LLC
- Projected COD
- 12/01/2028
- Entered queue
- 09/03/2025
- ERCOT zone
- COASTAL
- Size category
- Large
Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page
History
- 09/03/2025Entered the queue with 208 MW, projected COD 12/01/2028
- 09/03/2025Screening → FIS Requested
Other projects at this substation
| Gulf Prairie Solar | Solar | 202 MW | FIS Requested |