26INR0156 · BESS · Refugio County
Ross Storage
Ross Storage is a 511 MW battery storage project in Refugio County, Texas, connecting at tap the 345 kV Angstrom (#8249) – Static (#8676) line; AEP. ERCOT's October 2026 report shows it at the IA Signed stage with a projected commercial operation date of 07/31/2027.
ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved
Key facts
- INR
- 26INR0156
- Capacity
- 511 MW
- Fuel
- BESS (BA)
- County
- Refugio County
- Interconnecting entity
- S&S Renewables, LLC
- Projected COD
- 07/31/2027
- Entered queue
- 07/27/2023
- ERCOT zone
- COASTAL
- Size category
- Large
Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page
History
- 06/27/2024FIS Requested → IA Signed
- 07/27/2023Entered the queue with 511 MW, projected COD 07/31/2027
- 07/27/2023Screening → FIS Requested