Nacogdoches County power projects
Nacogdoches County, Texas has 3 active power projects totalling 588 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 487 MW (83%). The largest single project is Spindletop Solar (286 MW solar). 1 project has signed an interconnection agreement or reached a later stage. 2 projects in the county are listed as withdrawn or cancelled.
Active projects
3
0.6 GW capacity
IA signed or later
1
33% of active projects
Withdrawn or cancelled
2
listed by ERCOT
Changes tracked
3
since Sep 2026
Changes in Nacogdoches County
Stage change
09/16/2026
FIS Approved
Withdrawn
09/08/2026
−208 MW
Withdrawn
09/08/2026
−207 MW
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Spindletop Solar | Solar | 286 | Tap Stryker [3109] - Lufkin [3117] 345 kV line | IA Signed | 12/29/2027 |
| Timberline Solar | Solar | 201 | Tap 345 kV 3119 Nacogdoches SE - 3116 Mt Enterprise | FIS Requested | 10/05/2029 |
| Timberline Storage | BESS | 100 | Tap 345 kV 3119 Nacogdoches SE - 3116 Mt Enterprise | FIS Requested | 10/05/2029 |
| Sunlit Pines BESS SLF | BESS | 208 | Tap 138 kV 3342 Bayou Loco - 3341 Central Angelina County | Withdrawn | 09/12/2028 |
| Sunlit Pines Solar SLF | Solar | 207 | Tap 138 kV 3342 Bayou Loco - 3341 Central Angelina County | Withdrawn | 09/12/2028 |
For residents and landowners
- What power projects are planned in Nacogdoches County?
- ERCOT's October 2026 report lists 3 active projects in Nacogdoches County totalling 588 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.