Substation / point of interconnection · Kaufman County
Tap 345 kV Royse Switch (2478) – Poetry Switch (2485)
2 active projects totalling 259 MW are queued to connect at Tap 345 kV Royse Switch (2478) – Poetry Switch (2485) in Kaufman County, Texas, according to ERCOT's October 2026 report.
Active capacity
259 MW
queued at this substation
Active projects
2
2 projects ever listed
Withdrawn share EST
0%
of projects listed here
Voltage
345 kV
read from the name
Projects at this substation
| INR | Project | Fuel | MW | Stage | COD | Delays |
|---|---|---|---|---|---|---|
| 24INR0339 | Mystic Springs Renewable Energy Solar SLF | Solar | 259 | IA Signed | 03/31/2028 | 0 |
| 24INR0340 | Mystic Springs Renewable Energy Storage SLF | BESS | 0 | FIS Approved | 03/31/2028 | 0 |