Substation / point of interconnection ยท Ellis County
3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127
2 active projects totalling 504 MW are queued to connect at 3/4-Breaker Ring Bus at 345kV Venus Switch (#1907) BKR 4920 - Navarro Switch (LST) (#68091) BKR 3B3134/3B3127 in Ellis County, Texas, according to ERCOT's October 2026 report.
Active capacity
504 MW
queued at this substation
Active projects
2
2 projects ever listed
Withdrawn share EST
0%
of projects listed here
Voltage
345 kV
read from the name
Projects at this substation
| INR | Project | Fuel | MW | Stage | COD | Delays |
|---|---|---|---|---|---|---|
| 28INR0385 | Galaxy Solar 2 | Solar | 302 | FIS Requested | 10/30/2029 | 0 |
| 28INR0387 | Galaxy Storage 2 | BESS | 202 | FIS Requested | 10/30/2029 | 0 |