Substation / point of interconnection ยท Duval County

San Miguel (5901) - Cruce (80079) double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of 2027.

1 active project totalling 251 MW is queued to connect at San Miguel (5901) - Cruce (80079) double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of 2027. in Duval County, Texas, according to ERCOT's October 2026 report.

Active capacity
251 MW
queued at this substation
Active projects
1
1 project ever listed
Withdrawn share EST
0%
of projects listed here
Voltage
n/a
read from the name

Projects at this substation

INRProjectFuelMWStageCODDelays
28INR0040Black Hawk SolarSolar251FIS Requested12/31/20300