28INR0040 · Solar · Duval County

Black Hawk Solar

Black Hawk Solar is a 251 MW solar project in Duval County, Texas, connecting at San Miguel (5901) - Cruce (80079) double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of 2027.. ERCOT's October 2026 report shows it at the FIS Requested stage with a projected commercial operation date of 12/31/2030.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
28INR0040
Capacity
251 MW
Fuel
Solar (PV)
Interconnecting entity
ACE DevCo NC, LLC
Projected COD
12/31/2030
Entered queue
02/27/2024
ERCOT zone
SOUTH
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 11/21/2024
    Screening → FIS Requested
  • 02/27/2024
    Entered the queue with 251 MW, projected COD 12/31/2030