Substation / point of interconnection · Delta County
Tap Lake Creek Substation (#6835) – Enloe Switching station (#6834) 138 kV Line
2 active projects totalling 111 MW are queued to connect at Tap Lake Creek Substation (#6835) – Enloe Switching station (#6834) 138 kV Line in Delta County, Texas, according to ERCOT's October 2026 report.
Active capacity
111 MW
queued at this substation
Active projects
2
2 projects ever listed
Withdrawn share EST
0%
of projects listed here
Voltage
138 kV
read from the name
Projects at this substation
| INR | Project | Fuel | MW | Stage | COD | Delays |
|---|---|---|---|---|---|---|
| 24INR0137 | Eagle Springs Solar | Solar | 77 | IA Signed | 03/29/2027 | 1 |
| 24INR0136 | Eagle Springs Storage | BESS | 34 | IA Signed | 03/29/2027 | 1 |