25INR0706 · BESS · Brazoria County
Bocanova Power II
Withdrawn
Bocanova Power II is a 150 MW battery storage project in Brazoria County, Texas, connecting at 39030 TNMP Alvin 138kV. It is no longer active in ERCOT's interconnection queue.
ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved
Key facts
- INR
- 25INR0706
- Capacity
- 150 MW
- Fuel
- BESS (BA)
- Substation
- 39030 TNMP Alvin 138kV
- County
- Brazoria County
- Interconnecting entity
- Bocanova Power II LLC
- Projected COD
- 08/31/2026
- Entered queue
- 10/01/2024
- ERCOT zone
- COASTAL
- Size category
- Large
Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page
History
- 10/01/2026Listed as withdrawn UNCONFIRMED
- 06/12/2026Energization Approved → Sync Approved
- 05/27/2026IA Signed → Energization Approved
- 08/19/2025FIS Approved → IA Signed
- 03/07/2025FIS Requested → FIS Approved
- 10/01/2024Entered the queue with 150 MW, projected COD 08/31/2026
- 10/01/2024Screening → FIS Requested
Other projects at this substation