23INR0474 · BESS · Travis County

AP Greenport

AP Greenport is a 100 MW battery storage project in Travis County, Texas, connecting at Austrop – Lost Pines 345 kV transmission line (Bus #7040 – 9041). ERCOT's October 2026 report shows it at the FIS Approved stage with a projected commercial operation date of 11/19/2027.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
23INR0474
Capacity
100 MW
Fuel
BESS (BA)
Interconnecting entity
AP Greenport
Projected COD
11/19/2027
Entered queue
06/10/2022
ERCOT zone
SOUTH
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 09/29/2023
    FIS Requested → FIS Approved
  • 06/24/2022
    Screening → FIS Requested
  • 06/10/2022
    Entered the queue with 100 MW, projected COD 11/19/2027