LoneStarGrid
ERCOT GIS report of 10/01/2026 2 monthly reports compared Next update after ERCOT's next monthly report
Counties / Texas

Martin County power projects

Martin County, Texas has 3 active power projects totalling 492 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 492 MW (100%). The largest single project is Jane Storage Energy Center (241 MW battery storage). 1 project has signed an interconnection agreement or reached a later stage. 1 project in the county is listed as withdrawn or cancelled.

Active projects
3
0.5 GW capacity
IA signed or later
1
33% of active projects
Withdrawn or cancelled
1
listed by ERCOT
Changes tracked
0
since Sep 2026

Changes in Martin County

No changes in the reports compared so far.

All projects

ProjectFuelMWSubstationStageCOD
Jane Storage Energy CenterBESS24159901 Grelton 345 kVFIS Requested11/01/2030
Stewart Grady BESSBESS150Tap 138kV 11368 Expanse Switch – 23841 Sale RanchFIS Requested04/17/2029
Picadillo BESSBESS10123837 Buffalo 138kVIA Signed05/15/2028
Millennium Energy StorageBESS103Not listedWithdrawnn/a

For residents and landowners

What power projects are planned in Martin County?
ERCOT's October 2026 report lists 3 active projects in Martin County totalling 492 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.