ERCOT GIS report of 10/01/2026 2 monthly reports compared Next update after ERCOT's next monthly report
Counties / Texas

Brooks County power projects

Brooks County, Texas has 4 active power projects totalling 879 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 464 MW (53%). The largest single project is Verily Solar (FKA Cuello De Cuero Solar) (261 MW solar). 0 projects have signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.

Active projects
4
0.9 GW capacity
IA signed or later
0
0% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
0
since Sep 2026

Changes in Brooks County

No changes in the reports compared so far.

All projects

ProjectFuelMWSubstationStageCOD
Verily Solar (FKA Cuello De Cuero Solar)Solar26180078 Reforzar Switch Station 345kVFIS Requested07/01/2029
Reforzar BESS 1BESS208345 kV 80078 ReforzarFIS Approved04/13/2028
Reforzar Bess 2BESS208345 kV 80078 ReforzarFIS Requested04/13/2028
Kinenos SolarSolar203tap 345kV 8905 North Edinburg - 8455 Lon HillFIS Requested12/31/2029

For residents and landowners

What power projects are planned in Brooks County?
ERCOT's October 2026 report lists 4 active projects in Brooks County totalling 879 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.