Counties / Texas
Armstrong County power projects
Armstrong County, Texas has 5 active power projects totalling 3,252 MW in ERCOT's interconnection queue as of the October 2026 report. Wind is the largest share at 1,705 MW (52%). The largest single project is Zeus Armstrong BESS (1,043 MW battery storage). 1 project has signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.
Active projects
5
3.3 GW capacity
IA signed or later
1
20% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
0
since Sep 2026
Changes in Armstrong County
No changes in the reports compared so far.
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Zeus Armstrong BESS | BESS | 1,043 | Tap 345KV 23900 ALIBATES - 23914 TULECNYN CKT1 & CKT2 | FIS Requested | 04/17/2028 |
| Complex Serenity Wind | Wind | 971 | Double tap 345 kV Alibates (bus# 23900) to Tule Canyon (bus# 23914) and Tule Canyon (bus# 23914) to Midpoint Switch (bus# 23931) | FIS Requested | 04/16/2029 |
| Zeus Armstrong Solar | Solar | 504 | Tap 345KV 23900 AlLIBATES -23914 TULECNYN | FIS Requested | 04/17/2028 |
| Serenity Wind | Wind | 473 | 23931 MIDPOINT SWITCH 345 kV | FIS Requested | 09/18/2028 |
| Goodnight Wind II | Wind | 261 | tap 345kV 23900 Alibates - 23914 Tule Canyon CKT2 | IA Signed | 06/06/2027 |
For residents and landowners
- What power projects are planned in Armstrong County?
- ERCOT's October 2026 report lists 5 active projects in Armstrong County totalling 3,252 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.