Substation / point of interconnection · Borden County
Tap Long Draw (59900) – Faraday (59905) CKT 1 and LONGDRAW (59900) - GALVANI(59912) CKT 2
1 active project totalling 500 MW is queued to connect at Tap Long Draw (59900) – Faraday (59905) CKT 1 and LONGDRAW (59900) - GALVANI(59912) CKT 2 in Borden County, Texas, according to ERCOT's October 2026 report.
Active capacity
500 MW
queued at this substation
Active projects
1
1 project ever listed
Withdrawn share EST
0%
of projects listed here
Voltage
n/a
read from the name
Projects at this substation
| INR | Project | Fuel | MW | Stage | COD | Delays |
|---|---|---|---|---|---|---|
| 27INR0499 | Draco Solar | Solar | 500 | FIS Requested | 08/19/2027 | 0 |