30INR0092 · Solar · Zapata County
Wallflower Solar
Wallflower Solar is a 201 MW solar project in Zapata County, Texas, connecting at Tap the 345 kV Cenizo (#80225) - Del Sol (#80307) line.. ERCOT's October 2026 report shows it at the FIS Requested stage with a projected commercial operation date of 12/30/2029.
ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved
Key facts
- INR
- 30INR0092
- Capacity
- 201 MW
- Fuel
- Solar (PV)
- County
- Zapata County
- Interconnecting entity
- Wallflower Solar, LLC
- Projected COD
- 12/30/2029
- Entered queue
- 03/05/2026
- ERCOT zone
- SOUTH
- Size category
- Large
Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page
History
- 03/05/2026Entered the queue with 201 MW, projected COD 12/30/2029
- 03/05/2026Screening → FIS Requested
Other projects at this substation
| Wallflower Energy Storage | BESS | 209 MW | FIS Requested |