27INR0095 · Gas · Brazoria County

Bulldog Power (TEF - Due Diligence)

Bulldog Power (TEF - Due Diligence) is a 311 MW natural gas project in Brazoria County, Texas, connecting at 39703 TNMP FM524 Substation 138kV. ERCOT's October 2026 report shows it at the FIS Approved stage with a projected commercial operation date of 12/18/2027.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
27INR0095
Capacity
311 MW
Fuel
Gas (GT)
Interconnecting entity
Bulldog Power LLC
Projected COD
12/18/2027
Entered queue
11/08/2023
ERCOT zone
COASTAL
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 03/20/2026
    FIS Requested → FIS Approved
  • 11/08/2023
    Entered the queue with 311 MW, projected COD 12/18/2027
  • 11/08/2023
    Screening → FIS Requested

Other projects at this substation

Bulldog Power IIGas311 MWFIS Requested