27INR0091 · BESS · Lavaca County

Oak Tree Energy Storage

Oak Tree Energy Storage is a 310 MW battery storage project in Lavaca County, Texas, connecting at Tap Shaula (#5380) – South Texas (#5915). ERCOT's October 2026 report shows it at the IA Signed stage with a projected commercial operation date of 09/20/2030.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
27INR0091
Capacity
310 MW
Fuel
BESS (BA)
Interconnecting entity
Live Oak Energy Storage, LLC
Projected COD
09/20/2030
Entered queue
11/21/2023
ERCOT zone
SOUTH
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 05/26/2026
    FIS Requested → IA Signed
  • 11/21/2023
    Entered the queue with 310 MW, projected COD 09/20/2030
  • 11/21/2023
    Screening → FIS Requested