25INR0555 · Solar · Brazoria County

Stargazer Solar

Withdrawn

Stargazer Solar is a 158 MW solar project in Brazoria County, Texas, connecting at 44010 WA Parish - 42980 Nash 138 kV Ckt 02. It is no longer active in ERCOT's interconnection queue.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
25INR0555
Capacity
158 MW
Fuel
Solar (PV)
Interconnecting entity
Stargazer Solar LLC
Projected COD
02/01/2027
Entered queue
10/23/2023
ERCOT zone
COASTAL
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 09/14/2026
    Listed as inactive
  • 03/27/2026
    FIS Requested → FIS Approved
  • 10/23/2023
    Entered the queue with 158 MW, projected COD 02/01/2027
  • 10/23/2023
    Screening → FIS Requested

Other projects at this substation

Stargazer BESSBESS104 MWWithdrawn