25INR0458 · BESS · Brazoria County
Surfside Energy Storage
Surfside Energy Storage is a 50 MW battery storage project in Brazoria County, Texas, connecting at Tap 138kV 42110 Angleton – 43150 Riwood ckt 82. ERCOT's October 2026 report shows it at the FIS Requested stage with a projected commercial operation date of 12/31/2028.
ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved
Key facts
- INR
- 25INR0458
- Capacity
- 50 MW
- Fuel
- BESS (BA)
- County
- Brazoria County
- Interconnecting entity
- Rocky Mountain Energy Holdings, LLC
- Projected COD
- 12/31/2028
- Entered queue
- 07/19/2023
- ERCOT zone
- COASTAL
- Size category
- Large
Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page
History
- 02/28/2024Screening → FIS Requested
- 07/19/2023Entered the queue with 50 MW, projected COD 12/31/2028