23INR0376 · BESS · Brazoria County

Cascade Storage

Cascade Storage is a 250 MW battery storage project in Brazoria County, Texas, connecting at 345kV Oasis (43035) – Seabreeze circuit 27. ERCOT's October 2026 report shows it at the FIS Requested stage with a projected commercial operation date of 06/01/2028.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
23INR0376
Capacity
250 MW
Fuel
BESS (BA)
Interconnecting entity
Oyster Creek LLC
Projected COD
06/01/2028
Entered queue
09/09/2021
ERCOT zone
COASTAL
Size category
Large

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 09/09/2021
    Entered the queue with 250 MW, projected COD 06/01/2028
  • 09/09/2021
    Screening → FIS Requested