22INR0596 · BESS · Hamilton County
Grizzly Ridge BESS SLF
Grizzly Ridge BESS SLF is a 0 MW battery storage project in Hamilton County, Texas, connecting at Pottsville Switching Substation (Bus# 178). ERCOT's October 2026 report shows it at the Energization Approved stage with a projected commercial operation date of 07/01/2030.
ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved
Key facts
- INR
- 22INR0596
- Capacity
- 0 MW
- Fuel
- BESS (BA)
- County
- Hamilton County
- Interconnecting entity
- Grizzly Ridge Solar LLC
- Projected COD
- 07/01/2030
- Entered queue
- 10/18/2021
- ERCOT zone
- NORTH
- Size category
- Small
Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page
History
- 02/10/2023IA Signed → Energization Approved
- 10/18/2021Entered the queue with 0 MW, projected COD 07/01/2030
- 10/18/2021Screening → IA Signed
Other projects at this substation