22INR0596 · BESS · Hamilton County

Grizzly Ridge BESS SLF

Grizzly Ridge BESS SLF is a 0 MW battery storage project in Hamilton County, Texas, connecting at Pottsville Switching Substation (Bus# 178). ERCOT's October 2026 report shows it at the Energization Approved stage with a projected commercial operation date of 07/01/2030.

ScreeningFIS RequestedFIS ApprovedIA SignedEnergization ApprovedSync Approved

Key facts

INR
22INR0596
Capacity
0 MW
Fuel
BESS (BA)
Interconnecting entity
Grizzly Ridge Solar LLC
Projected COD
07/01/2030
Entered queue
10/18/2021
ERCOT zone
NORTH
Size category
Small

Source: ERCOT Generation Interconnection Status report, October 2026. ERCOT report page

History

  • 02/10/2023
    IA Signed → Energization Approved
  • 10/18/2021
    Entered the queue with 0 MW, projected COD 07/01/2030
  • 10/18/2021
    Screening → IA Signed