Jim Wells County power projects

Jim Wells County, Texas has 5 active power projects totalling 276 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 153 MW (56%). The largest single project is Raghorn Solar SLF (92 MW solar). 1 project has signed an interconnection agreement or reached a later stage. 2 projects in the county are listed as withdrawn or cancelled.

Active projects
5
0.3 GW capacity
IA signed or later
1
20% of active projects
Withdrawn or cancelled
2
listed by ERCOT
Changes tracked
0
since Sep 2026

Changes in Jim Wells County

No changes in the reports compared so far.

All projects

ProjectFuelMWSubstationStageCOD
Raghorn Solar SLFSolar92Tap 69kV #5654 San Diego - #5658 Orange GroveFIS Requested05/31/2028
Beaverhead Solar SLFSolar62Direct to Sub 69kv #5653 Ben Bolt.FIS Requested05/11/2029
Beaverhead Storage SLFBESS62Direct to Sub 69kv #5653 Ben Bolt.FIS Requested05/11/2029
Orange Grove BESSBESS615660 Orange Grove Switching Station 138 kVIA Signed04/30/2027
Raghorn Storage SLFBESS0Tap 69kV #5654 San Diego - #5658 Orange GroveFIS Requested05/31/2028
Bandana Solar SLFSolar87Not listedWithdrawnn/a
Bandana Storage SLFBESS0Not listedWithdrawnn/a

For residents and landowners

What power projects are planned in Jim Wells County?
ERCOT's October 2026 report lists 5 active projects in Jim Wells County totalling 276 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.