Counties / Texas
Jim Wells County power projects
Jim Wells County, Texas has 5 active power projects totalling 276 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 153 MW (56%). The largest single project is Raghorn Solar SLF (92 MW solar). 1 project has signed an interconnection agreement or reached a later stage. 2 projects in the county are listed as withdrawn or cancelled.
Active projects
5
0.3 GW capacity
IA signed or later
1
20% of active projects
Withdrawn or cancelled
2
listed by ERCOT
Changes tracked
0
since Sep 2026
Changes in Jim Wells County
No changes in the reports compared so far.
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Raghorn Solar SLF | Solar | 92 | Tap 69kV #5654 San Diego - #5658 Orange Grove | FIS Requested | 05/31/2028 |
| Beaverhead Solar SLF | Solar | 62 | Direct to Sub 69kv #5653 Ben Bolt. | FIS Requested | 05/11/2029 |
| Beaverhead Storage SLF | BESS | 62 | Direct to Sub 69kv #5653 Ben Bolt. | FIS Requested | 05/11/2029 |
| Orange Grove BESS | BESS | 61 | 5660 Orange Grove Switching Station 138 kV | IA Signed | 04/30/2027 |
| Raghorn Storage SLF | BESS | 0 | Tap 69kV #5654 San Diego - #5658 Orange Grove | FIS Requested | 05/31/2028 |
| Bandana Solar SLF | Solar | 87 | Not listed | Withdrawn | n/a |
| Bandana Storage SLF | BESS | 0 | Not listed | Withdrawn | n/a |
For residents and landowners
- What power projects are planned in Jim Wells County?
- ERCOT's October 2026 report lists 5 active projects in Jim Wells County totalling 276 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.