Counties / Texas
Dewitt County power projects
Dewitt County, Texas has 5 active power projects totalling 972 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 616 MW (63%). The largest single project is Shaula I BESS (206 MW battery storage). 2 projects have signed an interconnection agreement or reached a later stage. 2 projects in the county are listed as withdrawn or cancelled.
Active projects
5
1.0 GW capacity
IA signed or later
2
40% of active projects
Withdrawn or cancelled
2
listed by ERCOT
Changes tracked
0
since Sep 2026
Changes in Dewitt County
No changes in the reports compared so far.
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Shaula I BESS | BESS | 206 | 5380 Shaula 345kV | FIS Requested | 06/01/2028 |
| Shaula I Solar | Solar | 205 | tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1 | IA Signed | 06/15/2028 |
| Shaula II Solar | Solar | 205 | tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1 | IA Signed | 06/15/2028 |
| Shaula III Solar | Solar | 205 | tap 345kV 5133 Elm Creek - 5915 SO TEX ckt 1 | FIS Requested | 12/24/2025 |
| Yorktown BESS | BESS | 150 | (#78575) LCRA Yorktown 138 kV | FIS Requested | 12/16/2028 |
| BAYSIDE II SOLAR | Solar | 253 | Not listed | Withdrawn | n/a |
| Bayside 2 BESS | BESS | 252 | Not listed | Withdrawn | n/a |
For residents and landowners
- What power projects are planned in Dewitt County?
- ERCOT's October 2026 report lists 5 active projects in Dewitt County totalling 972 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.