Comal County power projects

Comal County, Texas has 3 active power projects totalling 867 MW in ERCOT's interconnection queue as of the October 2026 report. Battery storage is the largest share at 867 MW (100%). The largest single project is Enfinity Redbud Storage (516 MW battery storage). 0 projects have signed an interconnection agreement or reached a later stage. 1 project in the county is listed as withdrawn or cancelled.

Active projects
3
0.9 GW capacity
IA signed or later
0
0% of active projects
Withdrawn or cancelled
1
listed by ERCOT
Changes tracked
0
since Sep 2026

Changes in Comal County

No changes in the reports compared so far.

All projects

ProjectFuelMWSubstationStageCOD
Enfinity Redbud StorageBESS516345kV Hays Energy (7043) - 345kV Bergheim (7770)FIS Requested12/18/2029
Englehardt BESSBESS200River Oaks (7173)FIS Requested09/01/2027
Short River BESSBESS1507456 LOP3378 138kVFIS Requested04/30/2030
Madrone Energy StorageBESS102Not listedWithdrawnn/a

For residents and landowners

What power projects are planned in Comal County?
ERCOT's October 2026 report lists 3 active projects in Comal County totalling 867 MW. The table on this page lists each one with its fuel type, size, substation and stage.
Where do these projects connect to the grid?
Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
What does "IA Signed" mean?
The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
When would construction start?
Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
Does a project in the queue mean it will be built?
No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.