Counties / Texas
Brewster County power projects
Brewster County, Texas has 2 active power projects totalling 229 MW in ERCOT's interconnection queue as of the October 2026 report. Solar is the largest share at 126 MW (55%). The largest single project is Three Ranches Solar (126 MW solar). 0 projects have signed an interconnection agreement or reached a later stage. 0 projects in the county are listed as withdrawn or cancelled.
Active projects
2
0.2 GW capacity
IA signed or later
0
0% of active projects
Withdrawn or cancelled
0
listed by ERCOT
Changes tracked
0
since Sep 2026
Changes in Brewster County
No changes in the reports compared so far.
All projects
| Project | Fuel | MW | Substation | Stage | COD |
|---|---|---|---|---|---|
| Three Ranches Solar | Solar | 126 | TAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch | FIS Requested | 12/01/2029 |
| Three Ranches BESS | BESS | 103 | TAP 138kV #6680 Alamitto Creek - #60444 Hayter Ranch | FIS Requested | 12/01/2029 |
For residents and landowners
- What power projects are planned in Brewster County?
- ERCOT's October 2026 report lists 2 active projects in Brewster County totalling 229 MW. The table on this page lists each one with its fuel type, size, substation and stage.
- Where do these projects connect to the grid?
- Each project names a point of interconnection, usually a substation or a tap on a transmission line. Land near those points is where developers look for sites.
- What does "IA Signed" mean?
- The developer has signed an interconnection agreement with the transmission owner. It is one of the strongest signs in the queue that a project may be built, though projects can still withdraw.
- When would construction start?
- Usually 12 to 24 months before the projected commercial operation date (COD). CODs often move later; each project page shows how many times its COD has changed.
- Does a project in the queue mean it will be built?
- No. Many queued projects are never built. The queue shows requests to connect, not approved construction. County permits, tax agreements and financing are separate steps.